Description

The project widened and re-constructed Flint River Road from the existing two-lane facility to a three-lane facility with a continuous center turn lane beginning at Glenwoods Drive and ending east of Kendrick Road. The total project length was 1.13 miles.

Stage

Land
Concept
Design
Bidding
Construction
Completed
  • Budget

    $12,829,320.00

  • Commission District

    District 03 and District 04

  • Design Firm

    Atlas Technical Consultants

  • Served by Commissioner

    Commissioner Felicia Franklin and Commissioner DeMont Davis

  • Construction Firm

    Baldwin Paving Co., Inc.

  • Completion Date

    December 2020