Widening and Reconstruction of Flint River
Status: Complete
Project Type: Transportation Projects
Commission District: District 3 | District 4
Budget: $12,829,320.00
Design Firm: Atlas Technical Consultants
Description
The project widened and re-constructed Flint River Road from the existing two-lane facility to a three-lane facility with a continuous center turn lane beginning at Glenwoods Drive and ending east of Kendrick Road. The total project length was 1.13 miles.
Construction Firm
Baldwin Paving Co., Inc.
Completion Date
December 2020